TFT LCD Factory & Quality Control

Real ODM manufacturing processes, inspection controls and reliability support for industrial TFT LCD projects.

DISEA Electronics factory exterior and manufacturing campus
DISEA MANUFACTURING BASE

Factory-Direct Display Manufacturing Support

DISEA designs, develops and manufactures industrial TFT LCD modules, capacitive touch panels and LCD driver boards. Production support covers module assembly, touch integration, inspection, testing and repeat-order coordination.

0.9–15.6 inchDisplay solutions
5,000+Customization projects
POG–PackingIntegrated process coverage
DETAILED WORKFLOW

Explore the Real Production Process

Open each production stage to review its eight real process photos. Only the first stage is expanded by default.

01

POG Process — Glass Preparation & Electrical Testing

Glass cutting, basket loading, multi-stage washing, polarizer attachment, defoaming and electrical inspection.

DISEA POG process step 1: LCD Substrate Glass Cutting
01

LCD Substrate Glass Cutting

DISEA POG process step 2: Small Glass Pieces Placed in Baskets
02

Small Glass Pieces Placed in Baskets

DISEA POG process step 3: Eight-Tank Glass Washing & Drying
03

Eight-Tank Glass Washing & Drying

DISEA POG process step 4: LCD Electrical Test
04

LCD Electrical Test

DISEA POG process step 5: LCD Washing
05

LCD Washing

DISEA POG process step 6: Polarizer Attachment
06

Polarizer Attachment

DISEA POG process step 7: POG Defoaming
07

POG Defoaming

DISEA POG process step 8: POG Electrical Test
08

POG Electrical Test

02

FOG Process — Bonding & Particle Inspection

POG loading, plasma washing, ACF attachment, IC and FPC bonding, AOI inspection and glue dispensing.

DISEA FOG process step 9: POG Loading Equipment
09

POG Loading Equipment

DISEA FOG process step 10: LCD Step Plasma Washing
10

LCD Step Plasma Washing

DISEA FOG process step 11: ACF Attachment
11

ACF Attachment

DISEA FOG process step 12: IC Bonding
12

IC Bonding

DISEA FOG process step 13: FPC Bonding
13

FPC Bonding

DISEA FOG process step 14: AOI Particle Inspection
14

AOI Particle Inspection

DISEA FOG process step 15: FOG Electrical Test
15

FOG Electrical Test

DISEA FOG process step 16: Equipment Dispense Glue
16

Equipment Dispense Glue

03

LCM Process — Assembly & Finished Module Testing

Automatic drying, backlight and RTP assembly, soldering, finished module measurement, darkroom testing and coding.

DISEA LCM process step 17: Automatic Drying
17

Automatic Drying

DISEA LCM process step 18: Automatic Assembly Backlighting
18

Automatic Assembly Backlighting

DISEA LCM process step 19: Automatic Assembly RTP
19

Automatic Assembly RTP

DISEA LCM process step 20: Automatic Soldering
20

Automatic Soldering

DISEA LCM process step 21: Equipment Pull Handle
21

Equipment Pull Handle

DISEA LCM process step 22: LCM Finished Electrical Measurements
22

LCM Finished Electrical Measurements

DISEA LCM process step 23: Testing in the Darkroom
23

Testing in the Darkroom

DISEA LCM process step 24: Product Coding
24

Product Coding

04

CTP Process — Sensor Bonding & Touch Testing

Sensor plasma washing, ACF attachment, FPA bonding, electrical testing, OCA bonding, defoaming, scribing and UV curing.

DISEA CTP process step 25: Sensor Plasma Washing
25

Sensor Plasma Washing

DISEA CTP process step 26: Sensor ACF Attachment
26

Sensor ACF Attachment

DISEA CTP process step 27: Sensor FPA Bonding
27

Sensor FPA Bonding

DISEA CTP process step 28: Capacitive Screen FOG Electrical Test and Program Burning
28

Electrical Test & Program Burning

DISEA CTP process step 29: Cover Lens OCA Bonding
29

Cover Lens OCA Bonding

DISEA CTP process step 30: CTP Defoaming
30

CTP Defoaming

DISEA CTP process step 31: CTP Scribing Test
31

CTP Scribing Test

DISEA CTP process step 32: CTP UV Solidify
32

CTP UV Solidify

05

Packing Process — Final Inspection to Warehouse

Cover inspection, optical bonding, accessory assembly, protective-film application, OQC, wrapping, packing and warehouse handling.

DISEA packing process step 33: Cover Inspection and Cleaning
33

Cover Inspection and Cleaning

DISEA packing process step 34: LCM Optical Bonding
34

LCM Optical Bonding

DISEA packing process step 35: Accessories Assembly
35

Accessories Assembly

DISEA packing process step 36: Exterior Cleaning and Applying Protective Film
36

Exterior Cleaning & Applying Protective Film

DISEA packing process step 37: OQC Final Quality Control
37

OQC Final Quality Control

DISEA packing process step 38: Wrapping the LCM
38

Wrapping the LCM

DISEA packing process step 39: Packing
39

Packing

DISEA packing process step 40: Warehouse
40

Warehouse

QUALITY CONTROL

Inspection and Testing Throughout Production

Quality checks are integrated from incoming material review to final packing and shipment verification.

  1. Incoming InspectionLCD panel, IC, backlight, FPC, touch sensor and cover-lens checks.
  2. In-Process ControlBonding alignment, dust control, assembly and appearance inspection.
  3. Functional TestingImage, signal, brightness, touch response and abnormal-line screening.
  4. Outgoing QCFinal appearance, quantity, labels, packing and shipment verification.
TFT LCD module inspection at an ESD quality-control workstation
INSPECTION & RELIABILITY CAPABILITIES

Laboratory Inspection & Reliability Equipment

DISEA uses inspection, dimensional-measurement and environmental test equipment to support material evaluation, process verification and product reliability review. The applicable test plan is confirmed according to the display structure, operating environment and customer requirements.

DISEA Differential Interference Contrast Microscope
01

Differential Interference Contrast Microscope

Used to inspect surface structures, particles and microscopic defects.

DISEA Salt Spray Test Chamber
02

Salt Spray Test Chamber

Used to evaluate the corrosion resistance of materials and metal components.

DISEA Contact Angle Measuring System
03

Contact Angle Measuring System

Used to measure surface wettability, cleanliness and coating consistency.

DISEA Xenon Arc Weathering Test Chamber
04

Xenon Arc Weathering Test Chamber

Used to evaluate resistance to light, heat and accelerated weathering.

DISEA Walk-In Aging Test Chamber
05

Walk-In Aging Test Chamber

Used for batch aging and extended operational reliability verification.

DISEA Thermal Shock Test Chamber
06

Thermal Shock Test Chamber

Used to evaluate performance under rapid high- and low-temperature transitions.

DISEA Temperature and Humidity Test Chamber
07

Temperature and Humidity Test Chamber

Used to verify performance under controlled temperature and humidity conditions.

DISEA Automatic Vision Measuring System
08

Automatic Vision Measuring System

Used for dimensional measurement and appearance inspection of display-related components.

Testing scope, sample quantity, conditions and acceptance criteria are confirmed during project review and may vary by product requirement.

RELIABILITY & PROJECT SUPPORT

Support Beyond the Production Line

Testing and project-support items are confirmed according to the application and customer requirements.

Environmental Review

High/low temperature, thermal shock, humidity and sunlight-readable application review.

Touch & Cover Review

Touch sensitivity, water or glove use, cover-lens structure and optical-bonding review.

Supply Continuity

Lifecycle communication, repeat-order consistency, alternative planning and packing confirmation.

FACTORY & ENGINEERING REVIEW

Discuss Your Display Project with DISEA

Prepare your target size, interface, mechanical limits, application environment and available drawing or sample information.

Contact the Engineering Team